Project: Hamilton Hill

Project in Hamilton Hill

3 Lot Green Title Subdivision


Suburb: Hamilton Hill 


Original Number of Lots: 1


Final Number of Lots: 3


 

Agencies involved

– City of Cockburn
– Water Corporation
– Western Power

Planning Conditions

(Western Australian Planning Commission 2018 )

Contributions:

1. The landowner/applicant contributing towards development infrastructure provisions pursuant to the City of Cockburn Town Planning Scheme No. 3. (Local Government)

Drainage

2. The land being filled, stabilised, drained and/or graded as required to ensure that:

(a)  lots can accommodate their intended development; and

(b)  finished ground levels at the boundaries of the lot(s) the subject of this approval match or otherwise coordinate with the existing and/or proposed finished ground levels of the land abutting; and

(c)  stormwater is contained on-site, or appropriately treated and connected to the local drainage system. (Local Government)

3. Arrangements being made to the satisfaction of the Western Australian Planning Commission for the filling and/or capping of any bores and/or wells, or the identification of any bore and/or well to be retained on the land. (Local Government)

4. All septic sewer systems including all tanks and pipes and associated drainage systems (soakwells or leach drains) and any stormwater disposal systems are to be decommissioned, in accordance with the Health (Treatment of Sewerage and Disposal of Effluent and Liquid Waste) Regulations 1974, removed, filled with clean sand and compacted.  Proof of decommissioning is to be provided in the form of either certification from a licensed plumber or a statutory declaration from the landowner/applicant, confirming that the site has been inspected and all septic tanks, soakwells, leach drains and any associated pipework have been removed. (Local Government)

Subdivision Works:

5. Other than buildings, outbuildings and/or structures shown on the approved plan for retention, all buildings, outbuildings and/or structures present on lot(s) at the time of subdivision approval being demolished and materials removed from the lot(s). (Local Government)

6. Redundant vehicle crossover(s) to be removed and the kerbing, verge and footpath (where relevant) reinstated with grass or landscaping to the satisfaction of the Western Australian Planning Commission and to the specifications of the local government. (Local Government).

7. A notification, pursuant to Section 70A of the Transfer of Land Act 1893 is to be placed on the certificate(s) of title of the proposed lot(s).  Notice of this notification is to be included on the diagram or plan of survey (deposited plan), The Notification is to state as follows:

‘The lots are situated in the vicinity of a transport corridor and is currently affected, or may in the future be affected, by transport noise.’ (Local Government)

Servicing

8. Arrangements being made to the satisfaction of the Western Australian Planning Commission and to the specification of Western Power for the provision of an underground electricity supply to the lot(s) shown on the approved plan of subdivision. (Western Power)

9. Arrangements being made to the satisfaction of the Western Australian Planning Commission and to the specification of Western Power for the removal, relocation and/or replacement of electricity supply infrastructure, including plant and/or equipment located on or near the lots shown on the approved plan of subdivision. (Western Power)

10. Arrangements being made with the Water Corporation so that provision of a suitable water supply service will be available to the lots shown on the approved plan of subdivision. (Water Corporation)

11. Arrangements being made with the Water Corporation so that provision of a sewerage service will be available to the lots shown on the approved plan of subdivision. (Water Corporation)

Miscellaneous

12. Local Development Plan(s) being prepared and approved for lots shown on the plan dated 30 July 2018 (attached) that address noise amelioration measures to those lots affected by the impact of transport noise to the satisfaction of the Western Australian Planning Commission. (Local Government)

13. The landowner/applicant shall make arrangements to ensure that prospective purchasers of lots subject of a Local Development Plan are advised in writing that Local Development Plan provisions apply, (Local Government)”

Key Dates

– WAPC Approval – Form 1A

issued: July 2018
received: October 2018

– Service Agreements

Water Corporation

issued: October 2018
received: October 2018

Western Power

issued: November 2018
received: January 2019

– Clearances

Water Corporation

issued: April 2019
received: April 2019

Western Power

issued: March 2019
received: March 2019

Local Government

issued: Feb 2019
received: March 2019

– Landgate Plan Lodgement

issued
plan: May 2019
doc’s: May 2019

received
IOFD’s: June 2019

– WAPC – Form 1C

issued: April 2019
approved: June 2019

– Landgate Registration

New Titles Created: July 2019

Project: North Beach

Project North Beach

2 Lot Green Title Subdivision


Suburb: North Beach 


Original Number of Lots: 1


Final Number of Lots: 2


 

Agencies involved

– City of Stirling
– Western Power

Planning Conditions

(Western Australian Planning Commission 2019)

“1. All septic sewer systems including all tanks and pipes and associated drainage systems (soak wells or leach drains) and any stormwater disposal systems are to be decommissioned, in accordance with the Health (Treatment of Sewerage and Disposal of Effluent and Liquid Waste) Regulations 1974, removed, filled with clean sand and compacted. Proof of decommissioning is to be provided in the form of either certification from a licensed plumber or a statutory declaration from the landowner/applicant, confirming that the site has been inspected and all septic tanks, soak wells, leach drains and any associated pipework have been removed. (Local Government)

2. Arrangements being made to the satisfaction of the Western Australian Planning Commission and to the specification of Western Power for the provision of an underground electricity supply to the lot(s) shown on the approved plan of subdivision. (Western Power) ”

Key Dates

– WAPC Approval – Form 1A

issued: December 2018
received: March 2019

– Service Agreements

Western Power

issued: March 2019
received: March 2019

– Clearances

Western Power

issued: April 2019
received: April 2019

Local Government

issued: April 2019
received: May 2019

– Landgate Plan Lodgement

issued
plan: May 2019
doc’s: May 2019

received
IOFD’s: June 2019

– WAPC – Form 1C

issued: May 2019
approved: June 2019

– Landgate Registration

New Titles Created: July 2019

Project: Mount Pleasant

Project in Mount Pleasant

2 Lot Green Title Subdivision


Suburb: Mount Pleasant 


Original Number of Lots: 1


Final Number of Lots: 2


 

Agencies involved

– City of Melville
– Water Corporation
– Western Power

Planning Conditions

(Western Australian Planning Commission 2019 )

“1. The land being filled, stabilised, drained and/or graded as required to ensure that:

(a)  lots can accommodate their intended development; and

(b)  finished ground levels at the boundaries of the lot(s) the subject of this approval match or otherwise coordinate with the existing and/or proposed finished ground levels of the land abutting; and

(c)  stormwater is contained on-site, or appropriately treated and connected to the local drainage system. (Local Government)

2. All buildings, outbuildings and/or structures present on lots 301 and 302 at the time of subdivision approval being demolished and materials removed from the lots. (Local Government)

3. Arrangements being made with the Water Corporation so that provision of a suitable water supply service will be available to the lots shown on the approved plan of subdivision. (Water Corporation)

4. Arrangements being made with the Water Corporation so that provision of a sewerage service will be available to the lots shown on the approved plan of subdivision. (Water Corporation)

5. Arrangements being made to the satisfaction of the Western Australian Planning Commission and to the specification of Western Power for the provision of an underground electricity supply to the lot(s) shown on the approved plan of subdivision. (Western Power) ”

Key Dates

– WAPC Approval – Form 1A

issued: December 2018
received: January 2019

– Service Agreements

Water Corporation

issued: January 2019
received: January 2019

Western Power

issued: January 2019
received: February 2019

– Clearances

Water Corporation

issued: April 2019
received: April 2019

Western Power

issued: July 2019
received: July 2019

Local Government

issued: April 2019
received: May 2019

– Landgate Plan Lodgement

issued
plan: May 2019
doc’s: May 2019

received
IOFD’s: June 2019

– WAPC – Form 1C

issued: May 2019
approved: June 2019

– Landgate Registration

New Titles Created: November 2019

Project: Kardinya

Project in Kardinya

2 Lot Green Title Subdivision


Suburb: Kardinya


Original Number of Lots: 1


Final Number of Lots: 2


 

Agencies involved

– City of Melville
– Water Corporation
– Western Power

Planning Conditions

(Western Australian Planning Commission 2019 )

“1. The land being filled, stabilised, drained and/or graded as required to ensure that:

(a)  lots can accommodate their intended development; and

(b)  finished ground levels at the boundaries of the lot(s) the subject of this approval match or otherwise coordinate with the existing and/or proposed finished ground levels of the land abutting; and

(c)  stormwater is contained on-site, or appropriately treated and connected to the local drainage system. (Local Government)

2. Redundant vehicle crossover(s) to be removed and the kerbing, verge, and footpath (where relevant) reinstated with grass or landscaping to the satisfaction of the Western Australian Planning Commission and to the specifications of the local government. (Local Government)

3. Arrangements being made with a licenced water provider for the provision of a suitable water supply service to the lot(s) shown on the approved plan of subdivision. (Water Corporation)

4. Arrangements being made with the Water Corporation so that provision of a sewerage service will be available to the lots shown on the approved plan of subdivision. (Water Corporation)

5. Suitable arrangements being made with the Water Corporation for the drainage of the land either directly or indirectly into a drain under the control of that body. (Water Corporation)

6. Arrangements being made to the satisfaction of the Western Australian Planning Commission and to the specification of Western Power for the provision of an underground electricity supply to the lot(s) shown on the approved plan of subdivision. (Western Power) ”

Key Dates

– WAPC Approval – Form 1A

issued: February 2019
received: May 2019

– Service Agreements

Water Corporation

issued: May 2019
received: May 2019

Western Power

issued: May 2019
received: June 2019

– Clearances

Water Corporation

issued: August 2019
received: August 2019

Western Power

issued: July 2019
received: July 2019

Local Government

issued: August 2019
received: September 2019

– Landgate Plan Lodgement

issued
plan: July 2019
doc’s: September 2019

received
IOFD’s: October 2019

– WAPC – Form 1C

issued: September 2019
approved: October 2019

– Landgate Registration

New Titles Created: January 2020

Project: Gosnells

Project in Gosnells

2 Lot Green Title Subdivision – Boundary Re-Alignment


Suburb: Gosnells


Original Number of Lots: 2


Final Number of Lots: 2


 

Agencies involved

None – condition free approval

Planning Conditions

None – condition free approval

Key Dates

– WAPC Approval – Form 1A

issued: October 2019
received: December 2019

– Service Agreements

None – condition free approval

– Clearances

None – condition free approval

– Landgate Plan Lodgement

issued
plan: January 2020
doc’s: February 2020

received
IOFD’s: February 2020

– WAPC – Form 1C

issued: February 2020
approved: February 2020

– Landgate Registration

New Titles Created: In progress – –